In utility-scale solar project development, the early design phase is where competitive advantage is won—or lost. Developers must balance technical feasibility, regulatory risk, and landowner dynamics while moving fast enough to secure control and grid access.
But even the best teams can get slowed down—or worse, stuck—by early design assumptions that don’t hold up. From missing data layers to incomplete buildable area analysis, these solar design mistakes can derail timelines and weaken project viability.
This article highlights six common pitfalls we see across utility-scale solar developers—and how to avoid them for faster, more confident project delivery.
TL;DR
Design-stage mistakes usually stem from blind spots, not inexperience. Here's how to avoid them:
-
Centralize and streamline GIS data
-
Fully evaluate buildable constraints—not just slope
-
Prioritize grid and interconnection feasibility before securing land
-
Enable seamless collaboration across teams
-
Use stakeholder-ready visuals from day one
-
Consider battery storage co-location early—even if it’s a future phase
1. Collecting Data Layers from Disconnected Sources
Solar project development moves quickly—but fragmented GIS data slows everything down. When terrain maps, land use overlays, grid infrastructure, and exclusion zones are scattered across different sources or locked away in static files, early site evaluations become error-prone and time-consuming.
These inefficiencies not only stall initial assessments but can also lead teams to progress with incomplete or outdated information. Without centralized data, teams lose days per site chasing files, reworking layouts, or acting on outdated information. These inefficiencies can drain engineering time and push unviable sites too far down the pipeline.
Chint Solar, for example, reported that 60–70% of their engineering time was tied up in early-stage assessments before adopting Glint Solar to centralize and streamline this process.
See how Chint Solar saved 2,000 engineering hours per year?
How to avoid:
-
Centralize critical GIS data (slope, zoning, grid access, constraints) in one shared workspace
-
Empower solar project developers to work directly with spatial tools—without needing to be GIS experts
-
Maintain clean, up-to-date data sources to improve speed and consistency
2. Relying on Incomplete Buildable Area Assessments
Knowing how much of a site is actually usable for development is fundamental—but relying on limited criteria like slope alone can give a false sense of feasibility.
Buildable area analysis must go beyond the basics to capture the full range of technical, regulatory, and physical exclusions. When these factors are missed or underweighted, project capacity, yield, and permitting assumptions can quickly unravel.
Overlooking setbacks, conservation zones, or visual buffers, also means you risk overestimating project capacity and making flawed assumptions about permitting or financial viability. These missteps often aren't caught until late-stage engineering or permitting, forcing costly redesigns or project downsizing.
How to avoid:
-
Go beyond terrain: layer in permitting setbacks, conservation zones, and visual buffers
-
Use software that updates buildable area dynamically as constraints evolve
-
Evaluate multiple development scenarios to support investment-grade decisions early
3. Delaying Interconnection Feasibility
Even the most promising land parcel is meaningless without viable grid access. Yet many developers move forward with site control before assessing the feasibility, timeline, and cost of interconnection. In today’s congested grid environment, queue positions, capacity constraints, and upgrade liabilities can all render an otherwise viable project infeasible—if they aren’t identified early.
This delay can cost teams months of effort and tens of thousands in wasted development spend. Developers may lock in lease agreements or submit permits, only to later discover interconnection is either too expensive or too slow to be commercially viable. In worst-case scenarios, projects stall indefinitely in congested queues or get abandoned after significant investment.
How to avoid:
-
Incorporate transmission and distribution infrastructure into your solar site selection criteria
-
Review regional queue data and identify capacity-constrained substations
-
Loop in grid specialists before locking in layout or lease terms
4. Poor Collaboration Between GIS, Developers, and Engineers
Solar development is a multidisciplinary effort, but when teams use disconnected tools and workflows, critical context is often lost in translation. GIS teams generate layers, engineers handle layouts, and project developers manage land and permitting—but without integration, key updates or risks are overlooked. Miscommunication at this stage leads to rework, delays, and missed red flags that should have been caught earlier.
These inefficiencies can stack up quickly. DVP Solar shared that using Glint Solar saves them one full day per week by streamlining internal collaboration, reducing manual back-and-forth, and ensuring everyone works from a centralized source of truth. With fewer missed updates and tighter alignment between teams, they’re able to progress projects faster and more confidently.
How to avoid:
-
Centralize project data, layouts, and documentation in one collaborative platform
-
Create cross-functional design checkpoints—not just a handover
-
Ensure teams are working from the same source of truth throughout the project lifecycle
5. Failing to Equip Teams with Stakeholder-Ready Visuals
Securing landowner support and community buy-in requires more than accurate design—it demands clear communication. Yet many teams rely on technical documents that don’t help non-experts visualize what a solar project will look like on the ground. Without accessible visuals to convey impact, scale, and buffers, developers face slower land negotiations and increased public resistance during permitting.
This lack of clarity can lead to prolonged stakeholder discussions, delayed approvals, and even lost sites. When visuals aren’t easy to understand or are delivered too late, trust erodes—and with it, project momentum. In some cases, permitting timelines stretch by weeks simply because local concerns weren’t addressed early with clear, contextual renderings.
Glint Solar allows users to generate realistic visualizations of PV, BESS, and hybrid projects in seconds
How to avoid:
-
Use visualization tools that create 3D terrain renderings and line-of-sight simulations
-
Enable project developers and BD teams to generate visuals without relying solely on engineering
-
Share multiple layout options early to build trust and alignment with local stakeholders
6. Ignoring Storage Co-Location Potential
As markets evolve, grid flexibility and storage integration are becoming non-negotiable. Still, many developers design PV-only sites without considering how battery energy storage could enhance project value. By the time storage is considered, space and electrical capacity may already be constrained. Failing to account for co-location early can limit long-term returns and leave valuable grid opportunities untapped.
Overlooking storage during the design phase can force costly redesigns or make future hybridization technically or economically unfeasible. In high-value markets with flexible tariffs or grid congestion challenges, missing the storage opportunity can mean walking away from significant long-term revenue streams—and weakening the overall bankability of the project.
How to avoid:
-
Evaluate storage siting feasibility (space, zoning, fire codes) during solar design
-
Model energy storage scenarios like peak shaving, frequency regulation, and curtailment mitigation
-
Plan hybrid-ready interconnection early
From Informed Design to Confident Development
The strongest solar project pipelines are built on informed decisions early in the development process. Each of these pitfalls reflects outdated tools, fragmented processes, or missed collaboration—issues that compound as timelines advance.
Glint Solar was built to solve these challenges. With Glint Solar, utility-scale developers can:
-
Rapidly evaluate solar sites with centralized, real-time GIS layers
-
Analyze buildable area with technical and permitting constraints in mind
-
Design accurate layouts with PV and BESS potential from day one
-
Generate stakeholder-ready visuals in minutes—not days
-
Align GIS, engineering, and development teams on one integrated platform
Whether you're prospecting new markets or progressing a high-stakes site to permitting, Glint Solar gives your team the confidence, clarity, and speed to deliver projects that move.