Take Control of Your BESS Project Design
This spring: Stop outsourcing preliminary BESS designs for every new site.
For BESS Developers Who Need Answers Fast:
Your stakeholders want to know exactly how battery storage will work on their land. RFPs require quick storage feasibility assessments and getting preliminary designs shouldn't cost thousands for every site.
That changes this spring. Glint Solar's New BESS Feature Delivers:
- Rapid Storage Feasibility
Create unlimited preliminary BESS layouts yourself with engineering-approved settings. Stop paying consultants for early-stage work you can now do in-house. - Landowner approval in one meeting
Show realistic 3D visualizations of your battery storage system. Incorporate landowners' feedback directly into the analysis in real-time, turning "maybe" into "yes." - Seamless Solar + Storage Design
Design both solar and storage facilities in one platform. Respond to RFPs with confidence using real feasibility data.
Secure Your Priority Trial Access
Be among the first 50 developers to access the Glint Solar BESS feature this spring.
-
Be on the priority list for early trial access.
-
Stay updated as we get closer to launch this spring.
-
Once it’s live, our Sales team will be in touch to schedule your priority demo and set up your trial.
Don't just take our word for it

"We’ve been using Glint Solar’s BESS tool, and it’s made site assessments a lot easier. We can quickly check if a site works, find suitable locations near substations, and put together reports with maps and 3D layouts—without waiting on external consultants. We tested it against costly outsourced simulations, and the accuracy was solid. Even in Beta, it’s already saving us time and costs."